Key Bank Venture Operations Center - Parma, OH
Description: |
|
Complete interior demolition and re-construction of 53,000 SF of office space for the creation of a bank operations center. |
Owner: |
|
KeyBank |
Architect: |
|
The Austin Company |
Completion: |
|
December 2009 |
Volume: |
|
$3,710,600.00 |
Self-Performed Work: |
|
5% |
KeyBank Branches – Brunswick/Sheffield, OH
back to top
Description: |
|
KeyBank purchased two Donato's Pizza buildings and converted them into new 3,000+ SF KeyBank branches. Each location had all drywall, interior walls, and concrete floors removed before the renovation. Each location also added a small addition to the building for offices and ATM drive-thru for deposits and withdrawals. |
Owner: |
|
KeyBank Corporation |
Architect: |
|
Hengst Stref Bajko / Vocon |
Completion: |
|
April 2009 |
Volume: |
|
$1,536,750.00 |
Self-Performed Work: |
|
10% |
Alliance Bernstein Office at Key Tower, Cleveland, OH back to top
Description: |
|
8,800 SF Tenant Buildout. Office renovation with high end millwork, office fronts, etc. Conference rooms featured latest AV upgrades. |
Owner: |
|
Alliance Bernstein |
Architect: |
|
Gensler, Inc. |
Completion: |
|
February 2009 |
Volume: |
|
$1,424,200.00 |
Self-Performed Work: |
|
5% |
Hahn Loeser + Parks, Cleveland, OH back to top
Description: |
|
52,000 SF Tenant Buildout. Office renovation of the 27th and 28th Floors of 200 Public Square. Featured curved wood stairwell connecting the two floors and wood floor and paneling in the lobby area of the 28th floor. |
Owner: |
|
Hahn Loeser + Parks, LLP |
Architect: |
|
NBBJ |
Completion: |
|
June 2008 |
Volume: |
|
$4,221,000.00 |
Self-Performed Work: |
|
0% |
KeyBank Tower & Historic Building Renovation, Cleveland, OH back to top
Description: |
|
The project consisted of replacing flooring, wallpaper, ceramic tile and millwork on 22 occupied floors. All work was completed after hours and completed in 4 months. Also included renovating main conference room. |
Owner: |
|
KeyBank Corporation |
Architect: |
|
Oliver Design |
Completion: |
|
December 2007 |
Volume: |
|
$7,976,260.00 |
Self-Performed Work: |
|
5% |
PR Newswire, Cleveland, OH back to top
Description: |
|
26,000 SF Tenant Buildout. Office renovation at the Penton Media Building with critical mechanical and electrical components to allow 24 hour use. Generator was added in the building dock area for emergency back-up situation. |
Owner: |
|
PR Newswire |
Architect: |
|
Vocon |
Completion: |
|
November 2006 |
Volume: |
|
$1,817,995.00 |
Self-Performed Work: |
|
10% |
Cleveland Cav's Office at the "Q", Cleveland, OH back to top
Description: |
|
Work entailed demolition of existing 2 floors and reconstructing from bare space a open space plan that is the current headquarters of the Cleveland Cavalier's. An interconnecting stair case was added for a smoother flow of worker access. Work was completed in 3 months. |
Owner: |
|
Cleveland Cavaliers |
Architect: |
|
Vocon |
Completion: |
|
September 2006 |
Volume: |
|
$2,975,000.00 |
Self-Performed Work: |
|
10% |
McDonald Hopkins, Cleveland, OH back to top
Description: |
|
Complete interior build-out of new floor space and renovation to existing office space on floors 19 through 22 in the Fifth Third Center Office building totaling 68,000 SF. |
Owner: |
|
McDonald Hopkins Co., LLP |
Architect: |
|
NBBJ |
Completion: |
|
June 2006 |
Volume: |
|
$3,260,275.00 |
Self-Performed Work: |
|
5% |
ICI Paints, Strongsville, OH back to top
Description: |
|
Renovation of 80,000 SF of office space in 3 months. This project encompassed all aspects of renovation, one area was carpet and paint only, other areas were complete gut and rebuild and a third area had exterior walls removed and replaced with aluminum window systems. Since the owner was a paint and coatings manufacturer the majority of the finishes were products which were still in R&D or colors which were not available to the public so Infinity had to work closely with the owner on applications and finish techniques. |
Owner: |
|
The Glidden Company |
Architect: |
|
KA Architecture |
Completion: |
|
February 2005 |
Volume: |
|
$2,300,500.00 |
Self-Performed Work: |
|
5% |
Deloitte Touche, Cleveland, OH back to top
Description: |
|
50,000 SF Tenant Buildout. Office renovation of 3 floors at Key Tower. High end millwork office areas with open areas for the administration staff. |
Owner: |
|
Deloitte Touche |
Architect: |
|
Skidmore, Owens, Merrill |
Completion: |
|
October 2004 |
Volume: |
|
$5,539,370.00 |
Self-Performed Work: |
|
2% |
Hahn Loeser + Parks, Akron, OH back to top
Description: |
|
Complete interior build-out of 20,000 SF of commercial office space in the GO-JO Office building. |
Owner: |
|
Hahn Loeser + Parks, LLP |
Architect: |
|
The Core Group |
Completion: |
|
October 2004 |
Volume: |
|
$1,368,250.00 |
Self-Performed Work: |
|
2% |
Fifth Third Corporate Headquarters, Cleveland, OH back to top
Description: |
|
Renovation of existing bank branch located on the first floor was completed in 4 weeks with the remaining 7 floors having extensive modifications to offices, conference rooms and common areas. All new finishes were installed. Project was completed in 3 months. Approximately 70,000 SF of floor space was completed in the project. |
Owner: |
|
Fifth Third Bank |
Architect: |
|
Oliver Design |
Completion: |
|
September 2004 |
Volume: |
|
$2,975,000.00 |
Self-Performed Work: |
|
5% |
Hahn Loeser + Parks, Columbus, OH back to top
Description: |
|
Complete interior demolition and build-out of 19,000 SF of commercial office space in the Capitol Square Office building. |
Owner: |
|
Hahn Loeser + Parks, LLP |
Architect: |
|
The Core Group |
Completion: |
|
June 2004 |
Volume: |
|
$1,082,900.00 |
Self-Performed Work: |
|
0% |
Fifth Third Bank, Mayfield Heights, OH back to top
Description: |
|
New construction of a 5,000 SF 5/3rd Bank branch. This facility consisted of open teller space and 6 private offices. The building had 3 drive up windows and 1 ATM drive up. There was a walk in vault which consisted of a specially reinforced floor slab and precast walls and ceiling. |
Owner: |
|
Fifth Third Bank |
Architect: |
|
Oliver Design |
Completion: |
|
May 2004 |
Volume: |
|
$1,210,600.00 |
Self-Performed Work: |
|
5% |
Heinen's Corporate Headquarters, Warrensville Heights, OH back to top
Description: |
|
Project consisted of building from shell space approximately 24,000 SF of office space handling corporate space into one common area. Space was made up of offices, accounting, marketing, sales and a multitude of conference rooms. |
Owner: |
|
Heinen’s Corporation |
Architect: |
|
Oliver Design |
Completion: |
|
August 2002 |
Volume: |
|
$1,387,650.00 |
Self-Performed Work: |
|
5% |
American Cancer Society Community Center, Cleveland, OH back to top
Description: |
|
A 2-story steel frame building with masonry and glass/aluminum exterior wall systems. The Center includes general offices, training facilities, resource and reference libraries, conference rooms, and a 2-story atrium/gallery area. |
Owner: |
|
Cleveland Clinic |
Architect: |
|
Van DIJK, PACE, WESTLAKE |
Completion: |
|
March 2001 |
Volume: |
|
$3,096,820.00 |
Self-Performed Work: |
|
5% |
Alcoa Building 53 Renovation, Cleveland, OH back to top
Description: |
|
A 56,500 SF interior and exterior conversion of ALCOA’s 5-story Building 53 from industrial use to its Corporate Headquarters for the Forged Wheel Products Division. The project was lump sum bid, then Infinity was hired to facilitate start of construction while a $500,000 value engineering and re-design took place. Work included a new 5-story glass atrium structure, all new exterior windows, new elevators, the complete fit-out of 3 floors of office space, and a 3,300 SF lobby on the 1st floor. All 3 floors utilized a raised computer system with integral under floor air distribution system. The project was completed in just 7 months. |
Owner: |
|
Alcoa |
Architect: |
|
Design Collective |
Completion: |
|
June 2000 |
Volume: |
|
$5,490,550.00 |
Self-Performed Work: |
|
5% |
|