Montefiore Auditorium & Chapel Renovations, Beachwood, OH
Description: |
|
Renovation of 4500 SF Chapel/Auditorium; The project includes total removal and replacement of HVAC, New Entrances and Windows being cut into the existing exterior, refinishing of existing floor the addition of a kitchen/entrance hall. The project demands a high level of craftsmanship to match existing multiple trim and woodwork detail. |
Owner: |
|
Montefiore Nursing Home |
Architect: |
|
Herman Gibans Fodor Architects |
Completion: |
|
September 2009 |
Volume: |
|
$685,000.00 |
Self-Performed Work: |
|
10% |
St. Christopher’s Church, Rocky River, OH
back to top
Description: |
|
Renovation of the church building including reconfiguring the Sanctuary and relocating the east entrance. The entrance addition was constructed using the same stone as the original building. Infinity operated as the Construction Manager and was responsible for constructability, phasing, scheduling and cost budgeting and control. The church VCT floor was replaced with ceramic tile and all pews were removed off site had the finish stripped and refinished
and installed. New accent lighting was installed at the ceiling of the church over 55' in the air. All existing marble was removed and replace with custom wood to match the existing paneling. A new Ambo (lectern) was installed which was constructed so that it would move up and down hydraulically. This along with the other renovations made the entire Church and Sanctuary handicap accessible. The project was completed in 2 months as scheduled and came in $40,000 under budget. |
Owner: |
|
Catholic Diocese of Cleveland |
Architect: |
|
Tomsik & Tomsik Architects |
Completion: |
|
September 2008 |
Volume: |
|
$860,465.00 |
Self-Performed Work: |
|
10% |
St. Joseph’s Church Renovation, Strongsville, OH back to top
Description: |
|
Project consisted of new Baptistery, Alter table, flooring, entrance addition, lighting and plumbing upgrades and addition of parking areas. Project was completed in 3 months worth of phasing. |
Owner: |
|
St. Joseph’s Church |
Architect: |
|
CBLH Architects |
Completion: |
|
December 2005 |
Volume: |
|
$1,236,700.00 |
Self-Performed Work: |
|
5% |
Qwest - Cleveland Switch Facility, Cleveland, OH back to top
Description: |
|
The project consisted of the construction of a 27,000 SF telecom facility in a renovated existing building. Project scope included three 10,000 amp DC power rooms on raised steel platforms, six (6) zone pre-action fire suppression system, exterior emergency generator plant, AC power distribution, all cable tray systems, security work, and HVAC modifications. |
Owner: |
|
Qwest Com |
Architect: |
|
Middough & Associates |
Completion: |
|
May 2001 |
Volume: |
|
$5,100,000.00 |
Self-Performed Work: |
|
10% |
Sprint Switch Center, Cleveland, OH back to top
Description: |
|
The single story building is constructed of split-face load bearing masonry block with a steel joist and built-up roof system. Infinity was the general trades contractor to the construction manager, the M.A. Mortenson Company. Project scope included all earthwork, concrete foundations, slabs and site concrete, masonry, steel, roofing, windows, all interior construction and finishes, asphalt paving, and landscaping. All electrical, HVAC, plumbing,
and fire protection was by others. |
Owner: |
|
Sprint Com |
Architect: |
|
George Butler Associates |
Completion: |
|
April 1998 |
Volume: |
|
$1,087,000.00 |
Self-Performed Work: |
|
5% |
|