Avon Post Office, Avon, OH

Description:

 

The new 8,100 SF Post Office was constructed next to the Avon Fire Station with similar architecture as the Avon Police and Fire Station.  This building included a loading dock, ramp, post office boxes, and public mail desk area.

Owner:

 

City of Avon

Architect:

 

RWL Architects

Completion:

 

December 2008

Volume:

 

$1,481,600.00

Self-Performed Work:

 

5%




Avon Police Station, Avon, OH      back to top
 

Description:

 

This project consisted of a new 22,000 SF building with office areas, dispatch, public meeting area, detective bureau, evidence processing and storage, sally port and jail consisting of booking, interview room shower area, four holding cells, and detoxification cell.  A 6,000 SF evidence garage was also added along with a communication tower.

Owner:

 

City of Avon

Architect:

 

RWL Architects

Completion:

 

June 2008

Volume:

 

$3,040,690.00

Self-Performed Work:

 

5%




Solon Fire Station #2, Solon, OH      back to top
 

Description:

 

New construction of a 16,000 SF Fire Station.  All site concrete had a thickness of 14" to accommodate for the heavy loads of the fire trucks. A concrete pump truck was needed for every pour. The main steel framing of the Apparatus bay roof was constructed on the ground and raised into place as one piece.

Owner:

 

City of Solon

Architect:

 

Brandstetter, Carroll, Zofcin

Completion:

 

June 2008

Volume:

 

$3,560,800.00

Self-Performed Work:

 

3%




Lakewood Library, Lakewood, OH       back to top
  

Description:

 

Project entailed a 44,000 SF addition as well as renovation of 48,000 SF of existing space.  Challenges included renovation of the existing building which was built in the 1920's with two additions since that time.  Working with the existing structure entailed a great deal of planning and coordination prior to work being performed due to the aged structure.

Owner:

 

Lakewood Public Library

Architect:

 

Robert A.M. Stern Architects

Completion:

 

April 2008

Volume:

 

$9,936,500.00

Self-Performed Work:

 

1%




Rocky River Umerley Recreation Center, Rocky River, OH       back to top
  

Description:

 

Project entailed a 42,000 SF natatorium and fitness addition to the existing recreation center.  The   schedule dictated that the natatorium pools be constructed prior to building enclosure.  This caused difficulty in installation of MEP work at the ceiling level due to limited range of movement and access due to the pools.

Owner:

 

City of Rocky River

Architect:

 

Brandstetter, Carroll, Zofcin

Completion:

 

September 2007

Volume:

 

$6,860,000.00

Self-Performed Work:

 

1%




Rocky River Public Library, Rocky River, OH       back to top
  

Description:

 

Renovation and addition to the existing library.  Rocky River library has had 5 previous additions so changing the use of certain spaces was an issue with HVAC system.  This building had 5 different systems which were all integrated into one automated building control system.  All areas of the facility were renovated and the main entrance was closed for the addition of the new main entrance.  All work was performed in phases developed by Infinity and were executed as planned.  Over the 1 year project the library was closed for only 1 day which was planned to relocated materials which could not be completed overnight.  Infinity coordinated 10 prime contractors as well as several owner vendors which performed library specific work.  As the Construction Manager Infinity coordinated all field work, engineering and cost accounting not only for construction but all project costs for the library.

Owner:

 

Rocky River Library

Architect:

 

Van Dyke Architects

Completion:

 

March 2007

Volume:

 

$2,874,600.00

Self-Performed Work:

 

0%




Cuyahoga Heights Police Station, Cuyahoga Heights, OH       back to top
 

Description:

 

New construction of a 2 story police station with a full basement.  This building was built on a spot behind the existing police facility which remained in full operation until the new facility was opened.  The new facility was located just 5 feet behind the existing building and 8 feet from the adjacent property lines.  Coordination with neighbors was critical to this project.  Infinity as the general contractor assisted the owner in coordinating and designing the communications for this facility including, building access and control, radio communications, 911 system as well as phone, data and networks.  This coordination involved approximately 10 different vendors or utilities.  A 70' radio tower was installed on the property also.  The facility was a 12 day holding facility which included individual jail cells, holding cells as well as control centers.  This facility is the 911 dispatch for 6 cities.  Operation of the system was critical.

Owner:

 

Village of Cuyahoga Heights

Architect:

 

RCU Architects

Completion:

 

January 2007

Volume:

 

$4,000,000.00

Self-Performed Work:

 

2%




Bedford Heights Jail Expansion, Bedford Heights, OH       back to top
  

Description:

 

Bedford Heights Jail added a second floor on top of the existing building while the first floor was occupied by prisoners.  This made working below challenging, because all roof penetrations had to be checked each day, so that prisoners could not escape.  The existing HVAC system had to be removed during the winter, so the new 2nd floor concrete deck could be poured and walls built.  Temporary heaters were used to heat the jail area below while the second floor was completed and the new HVAC system was installed on the new 2nd floor roof.

Owner:

 

City of Bedford Heights

Architect:

 

RCU Architects

Completion:

 

May 2004

Volume:

 

$1,801,700.00

Self-Performed Work:

 

5%




Shaker Heights Fire Station #1, Shaker Heights, OH       back to top
  

Description:

 

New 21,000 SF fire station for the City of Shaker Heights, Ohio.

Owner:

 

City of Shaker Heights

Architect:

 

Collins Gordon Bostwick

Completion:

 

December 2003

Volume:

 

$3,445,305.00

Self-Performed Work:

 

5%




Columbia Station Library, Columbia Station, OH       back to top
  

Description:

 

Renovation and additional of a 6,000 SF library.  The city wanted to maintain the existing front of the library so we demolished 2 walls of the building and added on to the building.  The roof of the existing building was saved also to maintain historical integrity.

Owner:

 

Lorain County Library System

Architect:

 

Van Dyke Architects

Completion:

 

October 2003

Volume:

 

$918,000.00

Self-Performed Work:

 

10%




Bay Village Aquatic Center, Bay Village, OH       back to top
   

Description:

 

The existing pool and pool house was removed in the fall of 2002.  The new stainless/concrete pool, brick & wood bath house, and brick & wood filter building was constructed during the fall, winter 2002, and spring 2003.  Most work was completed during the long, hard winter of 2002, and the project was ready on time for the grand opening in June 2003.

Owner:

 

City of Bay Village

Architect:

 

Brandstetter, Carroll, Zofcin

Completion:

 

May 2003

Volume:

 

$1,252,320.00

Self-Performed Work:

 

10%




North Ridgeville Public Library, North Ridgeville, OH       back to top
  

Description:

 

New construction of a 27,400 SF library.  This facility was constructed of load bearing masonry and wood truss roof system.  The main reading area had exposed timber trusses with exposed wood decking.  Infinity also furnished and installed over $600,000 of custom millwork for this facility.

Owner:

 

Lorain County Library System

Architect:

 

Van Dyke Architects

Completion:

 

May 2003

Volume:

 

$3,724,000.00

Self-Performed Work:

 

20%




Avon Fire Station, Avon, OH       back to top

Description:

 

Construction of a new 4 bay fire station including living & sleeping quarters, training rooms, management offices.  Ground up project that took 7 months to complete.

Owner:

 

City of Avon

Architect:

 

RWL Architects, Inc.

Completion:

 

April 2003

Volume:

 

$1,457,400.00

Self-Performed Work:

 

10%




Rocky River Municipal Court, Rocky River, OH       back to top
  

Description:

 

Complete construction of a 3-story 24,720 SF municipal courthouse facility including 5 courtrooms, judges and magistrates chambers, Clerk of Courts offices, holding cells and all administrative offices and services of the court.  The project was completed 2 months ahead of schedule, and Infinity self-performed all millwork installations.

Owner:

 

City of Rocky River

Architect:

 

Madison International

Completion:

 

February 2003

Volume:

 

$4,296,300.00

Self-Performed Work:

 

5%

© Copyright 2009, Infinity Construction Co. Inc
18440 Cranwood Parkway • Warrensville Hts., OH 44128
Phone: 216-663-3777 • Fax: 216-663-3778

Company Info | Services | Projects | Contact Us | General Contractors | Construction Management