Projects

  • Tri-C Public Safety Training Center

    Tri-C Public Safety Training Center

    This project is a scenario-based Training Village for use by the Tri-C Police and Fire Academies, as well as external municipal police and fire departments.  Site work includes earthwork, utilities, concrete paving, lighting, landscaping and security cameras.  New construction includes…

    Read more

  • Echo Offices

    Echo Offices

    Infinity served as Construction Manager At-Risk for the complete interior demolition and re-construction of this building that Echo recently acquired.  Phase I involved the relocation of two existing building tenants to consolidate space for Echo’s use.  Phase II was a…

    Read more

  • University of Toledo – University Hall

    University of Toledo – University

    This general contracting assignment involved replacement of 341 windows on the top floor of University Hall including 78 "Cloverleaf" windows original to this building which was constructed in 1931. Achieved 15% EDGE participation for this very specialized project by creative teaming. …

    Read more

  • QIC Cleveland Offices

    QIC Cleveland Offices

    Infinity served as construction manager at risk for the complete build out of 18,600-sf on the 15th floor in Fifth Third Center in downtown Cleveland. High end finishes at reception area, conference, board rooms. General open office for remainder of…

    Read more

  • World Shipping HQ Offices

    World Shipping HQ Offices

    This 31,500-sf project involves minor demolition on floors 1-2, nearly gut demolition on 3rd and 4th floor.  New construction includes reception area, offices, board room, conference rooms, cafe, wellness center, server room, restrooms and an outdoor patio.  mail room, cafe, conference…

    Read more

  • Warrensville PK-5 School

    Warrensville PK-5 School

    This new PK-5 school will be built after we abate and then demolish an existing vacant school building on site at 21865 Clarkwood Parkway.  The new 88,264-sf building will feature 21st Century Learning classrooms, an enlarged gymnasium.  The new facility will…

    Read more

  • MetroHealth – Behavioral Health

    MetroHealth – Behavioral Health

    This 10,485-sf micro-phased construction management at-risk project begins with selective demolition and abatement.  Subsequent renovations include modifying existing conditions including doors/hardware, toilet/lavatory fixtures/trim, ceiling grilles and diffusers and fasteners etc.  Reconfiguration creates new ante room(s) at entry to unit, reconstruction…

    Read more

  • South Pointe Hospital

    South Pointe Hospital

    This project completed in two-phases. the 5th floor is a partial renovation that involves replacement flooring, ceiling, finishes, and relocation of some walls and offices. It accommodates dialysis unit, and the Grace Hospital South Pointe rehabilitation unit. After completing the…

    Read more

  • Toledo Chop House

    Toledo Chop House

    This construction management assignment at the new ProMedica headquarters is located at the Three Seagate Building on Summit Street.  This 6,700-sf first-floor restaurant features seating for 200, a full bar, full-service kitchen and administrative offices.   Premium finishes include brass mesh ceiling,…

    Read more